Kingstone retaining wall construction recommendations

Limestone retaining wall building in Colorado: If the wall runs up a hill, continue each base course into the hill until the top of the second course is level with the grade, and then start your second base course at that point. If you have the option, it can be easier to excavate and lay the lowest course before excavating the trench for the next step, especially if you have to step up several times. Save yourself some money and install the cheapest style/color that matches the wall style (usually the gray ones) on the bottom course since it won’t be seen.

NFC can either be mixed on-site for smaller areas or purchased from a reputable concrete supplier and trucked in for larger commercial applications. NFC is mixed at a 6:1 ratio by volume of 20mm max size clean aggregate and cement. Water content should be such that the cement slurry evenly coats the aggregate and retains a wet/glossy appearance without excess slurry running off, this is typically around 40 litres per 100kg of cement. With the use of NFC, we are able to build Block Retaining Walls in areas and situations where normal construction methods would not work. Some of these situations are: In areas where excavation behind the wall is limited either due to being on a boundary or close to other structures or footings.

We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. We serve all of Colorado out of our home office in Colorado Springs. Please feel free to reach out to us with any questions you may have. Estimates are always free and everything we touch comes with a warranty. See extra info at Best Retaining Walls Colorado.

Designing very tall walls gets rather complex when accounting for lateral pressure, as do the reinforcement options. For example, a retaining wall 8 feet tall is not just twice as strong as a wall 4-foot tall. The 8-foot wall actually needs to be four times stronger. For walls taller than 4 feet, hiring a licensed engineer to develop a design would be a smart move. At the very least, remember to follow the system manufacturer’s instructions to the letter. Plus, keep in mind that building big walls means moving truckloads of soil, gravel and heavy block.

DON’T forget to allow for drainage. Groundwater is the natural enemy of retaining walls. When it saturates clay-type soils, they swell and put excessive pressure on the backside of the wall. To avoid failure, make drainage provisions at the same time as you go about building the retaining wall. Backfilling the space behind the blocks with crushed stone and then installing a flexible perforated drainpipe (available at The Home Depot), also called “drain tile,” at the base of the wall could create the necessary escape route for groundwater. The perforated pipe will carry groundwater to each end of the wall where it can drain harmlessly away. The ends of the drainpipe should then exit on each end of the wall, and you may cover them with crushed stone to camouflage their appearance.